Tuesday, 14 July 2015

More on timbering

We have been making steady progress with re-timbering Nanw. It was decided to take out 'batches' of timbers in sections and to date the mid ships and forward areas has been done and re-fastened to just below sheer strake level. We have just steamed another six in place aft of the after thwart so she is done to the transom. Progress is a bit faltering as I have to 'borrow' helpers to do the nailing.
The virgin timber is wrapped up in polythene and damp towels to prevent it drying out but it cannot stay like that forever, obviously, and the new wood is blackening with mould.
One job I have been able to do on my own to follow up the main nailing is to make and insert wedges between the timbers and the upper strakes to support them for when the inwale is eventually fastened through. Originally the timbers stopped short under the inwale timber which was fastened to the walestrake and knees only. I have decided to give her an open 'box' type gunwale with the timbers finishing flush with the sheer - a stronger and lighter arrangement.
Wedges fitted behind timbers. Black spots are from the clamps and will be hidden eventually.

After section of the boat cleaned out ready for timbering